Strengthener for expectation of Autoco?
Expectation is to reduce time and cost.
By Rule of Elimination, exclude A,B,C and D since these mention irrelevant factors and do not reduce time and cost for Company.
Option E is left. This option mentions that "the designers have wide range of previously prepared parts designs that can readily be modified for a new car". This point saves time and cost. Therefore, correct option.
Expectation is to reduce time and cost.
By Rule of Elimination, exclude A,B,C and D since these mention irrelevant factors and do not reduce time and cost for Company.
Option E is left. This option mentions that "the designers have wide range of previously prepared parts designs that can readily be modified for a new car". This point saves time and cost. Therefore, correct option.
Statistics : Posted by Nehak24 • on 18 Jun 2016, 10:29 • Replies 30 • Views 41887