At present majority of the substations handle between 60 and 80 percent of their maximum current load
The current load is expected to rise 3 times that is 300 percent
Above maximum capacity means it can be anything from 101 to anything beyond that
The negation test does not break the conclusion in every possible instance
After all it has no where been mentioned that current will rise well above the maximum level what the official explanation mentions
Well it can be a necessary assumption but not a sufficient assumption and for this perticular question we need a sufficient assumption
B is undoubtedly incorrect and A is neither
Posted from my mobile device
The current load is expected to rise 3 times that is 300 percent
Above maximum capacity means it can be anything from 101 to anything beyond that
The negation test does not break the conclusion in every possible instance
After all it has no where been mentioned that current will rise well above the maximum level what the official explanation mentions
Well it can be a necessary assumption but not a sufficient assumption and for this perticular question we need a sufficient assumption
B is undoubtedly incorrect and A is neither
Posted from my mobile device
Statistics : Posted by pradeepbhuyan • on 11 Aug 2015, 03:16 • Replies 18 • Views 11920








.jpg)

