Quantcast
Channel: GMAT Club Forum - Forums > Reading Comprehension (RC)
Viewing all articles
Browse latest Browse all 291973

Critical Reasoning (CR) | Re: Editorial: The roof of Northtown Council’s equipment-storage

$
0
0
DmitryFarber wrote:

This is a causal argument. The author is assuming that because the building was otherwise built to code, the one departure must be responsible for the problem. Maybe there was some other cause of the collapse.

(B) provides this other cause. The snow was too much even for a built-to-code structure to withstand.

(A) actually strengthens the argument by suggesting that no building that conformed to code collapsed.
(C) hints that perhaps the building wasn't up to the best standard, but this is irrelevant.

...

Viewing all articles
Browse latest Browse all 291973

Latest Images

Trending Articles



Latest Images

<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>