MathRevolution wrote:
Machine A can do a job in 24 hours at a constant rate. If Machine A does the job for 8 hours and Machine B does the rest of the job, which works at 2/3 constant rate of Machine A. How long will it take for Machine B alone to do the rest of the job?
A. 12hrs
B. 16hrs
C. 24hrs
D. 28hrs
E. 32hrs
B's time=(3/2)*24=36 hours
(2/3 job)/(1/36 rate)=24 hours
C